Green building strategyIssuing time:2020-12-09 16:07 In the process of design and production, according to the different climate conditions of the project location, targeted environmental climate analysis is carried out, and the scheme optimization design based on green building is carried out after simulation calculation. From the analysis of the annual data of the location, it is generally necessary to consider shading in the East and West, while shading and daylighting should be considered at the same time for the south facade. According to the analysis of wind frequency, the annual wind direction is mainly composed of northeast wind and southwest wind. In winter, insulation measures need to be improved, so the insulation design of northeast facade is particularly important; in summer, indoor ventilation efficiency needs to be improved. According to the specific requirements of different regions for sunshine, the illuminance under different working conditions is calculated, and the most reasonable and applicable window opening method is selected based on the comprehensive consideration of building thermal performance. In the process of design and production, according to the different ventilation conditions of the project site, the ventilation simulation (mainly by CFD) is carried out, and the scheme optimization design based on the ideal ventilation efficiency is carried out after the simulation calculation. |